Mon, 22 Dec 2008 07:36:12 -0600 Machine studies-shutter permit
Shutter permit will be removed at 08:15 (instead of 08:00) for the start of machine studies today (12/22).
Fri, 19 Dec 2008 13:05:53 -0600 Shutter permit
On 12/19/08 at 11:52, Operations enabled shutter permit with 102mA of stored beam, non-top-up, 0+324x1 fill pattern.
Fri, 19 Dec 2008 11:36:57 -0600 SR RF 2 repairs complete
The SR RF 2 repairs are complete. We are preparing to inject. ETA for beam: Friday 12/19/08 12:00.
Fri, 19 Dec 2008 09:33:53 -0600 B:EK magnet repairs
The repairs to the Booster Extraction Kicker Magnet are complete. PS Group personnel are testing the Kicker. Also, RF Group personnel are testing Booster RF 3 and SR RF 2. Stored beam estimate: Friday 12/19/08 12:00.
Fri, 19 Dec 2008 07:30:02 -0600 B:EK Magnet repairs
Booster Extraction Kicker Magnet repairs are ongoing inside the Booster Tunnel. ETA for beam Friday 12/19 12:00.
Fri, 19 Dec 2008 05:37:03 -0600 Beam ETS
The Booster power supply repairs are in progress. Beam will not be available until 07:10 at the earliest. More information will be conveyed using the message screen and xrayops email if and when it becomes available.
Fri, 19 Dec 2008 03:22:34 -0600 Injector repair update
The repair of the Booster pulsed power supply is projected to take at least 4 hours. Beam will not be available until 07:10 at the earliest. More information will be conveyed using the message screen and xrayops email if and when it becomes available. ASDOPS
Fri, 19 Dec 2008 02:35:55 -0600 Injector repair update
Power supply group personnel are on-site investigating a possible short concerning a Booster extraction pulsed power supply. A tunnel access is needed. There is not an estimated time of repair currently.
Thu, 18 Dec 2008 23:50:17 -0600 Injector repair delaying stored beam
A Booster pulsed power supply has failed. Power Supply group personnel have begun initial investigation, yet no estimate has been made for the repair. We will update again at 01:30 unless further information regarding the repair has been discovered. ASDOPS
Thu, 18 Dec 2008 22:59:39 -0600 New problem delaying recovery.
A Booster Pulsed Power Supply [B:EK:PS] has apparently failed. Power Supply Group personnel have been contacted and will be coming in to investigate. A further email will be sent when an estimated time of repair is available.
Thu, 18 Dec 2008 22:35:37 -0600 (CST) Repairs completed and stored beam time frame
Approvals have been obtained and repairs are ongoing. Repairs should be completed and beam stored at ~2315hrs.
Thu, 18 Dec 2008 22:05:16 -0600 Beam Loss recovery
The recovery from the last beam loss is underway. The appropriate personnel are being contacted for approval for further work that needs to be done. Once this approval is obtained, another email will be sent with an estimated time of repair.
Thu, 18 Dec 2008 18:17:50 -0600 (CST) No Fill on Fill tonight 12/18
Beam was restored this afternoon [12/18] at 16:09. Per policy, there will not be a refill of the SR tonight at 19:45 as this is less than four hours after Shutter Permit was enabled.
Thu, 18 Dec 2008 13:27:47 -0600 (no subject)
The RF group was unable to fix the booster RF systems. We are switching to a backup RF system to run for the booster. This will take approximately 3 hours. Operations
Thu, 18 Dec 2008 11:03:17 -0600 beam loss
Due to an interruption in electrical power, stored beam has been lost. An investigation is currently underway. We do not expect to have beam back within the next 2 hours. OPS
Thu, 18 Dec 2008 10:22:48 -0600 Updated estimated for refill of the Storage Ring
The repair of the motorized fused disconnect for the Booster RF system is well underway and will most likely finish within the next hour or so. Once that repair has finished, the RF Group will need to verify that the original problem causing the Mod Anode voltage drop in that RF system was successfully repaired yesterday. Based on this information, we estimate the refill of the SR will take place at approximately 13:00. A PA announcement will be made at least 1/2 hour before the refill. We will send out further e-mail updates as more information becomes available. Karen Schroeder
Wed, 17 Dec 2008 17:46:44 -0600 Scheduled refill of the Storagering Canceled
The 19:45 refill of the storage ring tonight and, most likely, the 07:45 refill tomorrow will be canceled due to problem with the motorized fused disconnect which provides power to the Booster RF system. This piece of equipment is located outside and, due to the weather and lack of light, no work can be performed on this system until tomorrow morning. We should know between 10:00 and 12:00 tomorrow whether this equipment can be repaired by 16:00. If it cannot be, we will schedule a storage ring beam dump and switch to a back-up RF system. This switch will result in no stored beam for approximately three hours. If stored beam is lost before the equipment can be repaired, personnel will be contacted to come in immediately and do the switch to the back-up RF system at that time. The downtime in this case would be expected to be in the 3-1/2 to 4 hour range. We will send out an update at around 10:00 tomorrow, or earlier if we have any information regarding the repair. Karen Schroeder Storage Ring, Chief of Operations
Mon, 15 Dec 2008 14:47:20 -0600 (no subject)
at approximately 14:34 on Monday the 15th we lost a P0 timing signal for the storage ring. It was neccessary to suspend orbit controllaws and RTFB to correct the issue. The issue was corrected 14:43.
Sun, 14 Dec 2008 00:20:48 -0600 (CST) (no subject)
The Storage Ring power supply has been replaced, Estimate for Stored beam is 01:00
Sat, 13 Dec 2008 22:35:40 -0600 Power supply trip
SR beam lost due to S1A:S2 PS tripat 21:53 this evening. Power supply group has been notified and is coming in to investigate/ repair. The beam estimate is 00:30.
Sat, 13 Dec 2008 09:00:16 -0600 (CST) (no subject)
Due to a EPS trip and a later trip of a SR magnet the fill has been delayed until ~10:20
Fri, 12 Dec 2008 16:02:27 -0600 SR RT feedback and XRDP orbit correction have been suspended from 14:59 to 15:28 today
SR RT feedback and XRDP orbit correction have been suspended from 14:59 to 15:28 today in order to correct a P0 error which occured at 14:59 ASD-AOP
Thu, 11 Dec 2008 22:39:39 -0600 fill on fill was delayed this evening
on Thursday 12/11/2008 the 19:45 fill on fill has been delayed by 7 minutes due to injector issue (Booster B:QF quadrupole focusing power supply ramp dI/I peak and RMS fluctuations). ASD-AOP
Mon, 8 Dec 2008 23:02:07 -0600 (CST) Brief beam motion
On 12/08/08 at 22:24:40 the storage ring beam horizontal and vertical beam motion increased by more than 10% due to the loss of a storage ring power supply. The beam motion returned to normal at 22:25:30.
Mon, 08 Dec 2008 11:53:51 -0600 Top-Up has been re-enabled
Mon, 08 Dec 2008 11:49:10 -0600 SR orbit controllaw and RTFB has been re-enabled
Investigation into the timing issue continues.
Mon, 08 Dec 2008 11:39:43 -0600 Orbit controllaw and RTFB has been aborted
Orbit controllaw and RTFB has been aborted to facilitate the timing issue investigation.
Mon, 08 Dec 2008 11:15:02 -0600 Timing issue
Investigation into a timing issue continues. Top-Up is still aborted.
Mon, 08 Dec 2008 10:56:49 -0600 Top-Up aborted
Top-Up was aborted ~10:39hrs due to a timing issue. Investigation is ongoing.
Sat, 6 Dec 2008 10:56:24 -0600 Fill-on-Fill
Fill-on-Fill The scheduled fill-on-fill to 102mA will be at 11:10. XRAYOPS at mailman.aps.anl.gov
Sat, 06 Dec 2008 10:43:19 -0600 Fill-on-Fill
The scheduled fill-on-fill to 102mA will be at 11:10.
Sat, 06 Dec 2008 10:26:08 -0600 Top-Up restarted / fill-on-fill info
Top-Up was restarted at 10:16. A fill-on-fill back to 102mA will be performed at 10:50.
Sat, 06 Dec 2008 10:20:17 -0600 Top-up aborted
Top-up has been aborted. We are investigating a problem with extracting beam from the Booster.