Listing of Statistics for Run3-2008 (Created Tue Jan 06 19:05:51 CST 2009)
User periods in this interval
10/01/2008 08:00 To 10/07/2008 08:00 144.00 Hours, Delivered Beam: 144.00 Hours, 0 Fault(s),144.00 MTBF,100.00% of Sched. Time 10/08/2008 08:00 To 10/14/2008 08:00 144.00 Hours, Delivered Beam: 144.00 Hours, 0 Fault(s),144.00 MTBF,100.00% of Sched. Time 10/15/2008 08:00 To 10/20/2008 08:00 120.00 Hours, Delivered Beam: 116.88 Hours, 3 Fault(s), 38.96 MTBF, 97.40% of Sched. Time 10/22/2008 08:00 To 10/28/2008 08:00 144.00 Hours, Delivered Beam: 144.00 Hours, 0 Fault(s),144.00 MTBF,100.00% of Sched. Time 10/29/2008 08:00 To 11/03/2008 08:00 121.00 Hours, Delivered Beam: 117.59 Hours, 2 Fault(s), 58.79 MTBF, 97.18% of Sched. Time 11/05/2008 08:00 To 11/11/2008 08:00 144.00 Hours, Delivered Beam: 135.07 Hours, 6 Fault(s), 22.51 MTBF, 93.80% of Sched. Time 11/12/2008 08:00 To 11/18/2008 08:00 144.00 Hours, Delivered Beam: 141.88 Hours, 2 Fault(s), 70.94 MTBF, 98.53% of Sched. Time 11/19/2008 08:00 To 11/26/2008 24:00 184.00 Hours, Delivered Beam: 183.99 Hours, 0 Fault(s),183.99 MTBF,100.00% of Sched. Time 11/28/2008 08:00 To 12/02/2008 08:00 96.00 Hours, Delivered Beam: 95.19 Hours, 1 Fault(s), 95.19 MTBF, 99.16% of Sched. Time 12/03/2008 08:00 To 12/09/2008 08:00 144.00 Hours, Delivered Beam: 144.00 Hours, 0 Fault(s),144.00 MTBF,100.00% of Sched. Time 12/10/2008 08:00 To 12/16/2008 08:00 144.00 Hours, Delivered Beam: 138.84 Hours, 2 Fault(s), 69.42 MTBF, 96.41% of Sched. Time 12/17/2008 08:00 To 12/18/2008 11:51 27.85 Hours, Delivered Beam: 26.69 Hours, 1 Fault(s), 26.69 MTBF, 95.85% of Sched. Time 12/18/2008 11:55 To 12/22/2008 08:00 92.08 Hours, Delivered Beam: 73.18 Hours, 1 Fault(s), 73.18 MTBF, 79.47% of Sched. Time
Total Amount of User Time in this interval 1648.90 HoursDelivered Beam 1605.29 Hours
Percentage of Scheduled Time (*) 97.36 %
Mean Time Between Faults (MTBF) 89.18 Hours
Downtime During Period 43.60 Hours
Total integrated Current During This Period 160.49 A-hr
Mean Fill Duration in Period 84.49 Hours
Faults per Day of Delivered Beam 0.27
Total Number of Faults 18
Valid fills Beginning in this Time Interval      
Fill # Start  End Duration
(min: 1.0)
Reason for Fill Termination Length of Downtime Downtime is associated with the end of a fill. The first fill of a period will have any downtime before the fill on the line above.

  0.00
# 1 10/01 08:00 To 10/07 08:00 144.00    Int Dump: End of Period 0.00

  0.00
# 2 10/08 08:00 To 10/14 07:59 144.00    Int Dump: End of Period 0.00

  0.00
# 3 10/15 08:00 To 10/15 13:37 5.63    Bldg.450 controller[OTH] 1.04 Controller reset&temps returned to normal, refilled
# 4 10/15 14:40 To 10/19 15:38 96.97    Power Supply trip [PS] 1.80 Power supply swap, refilled
# 5 10/19 17:26 To 10/20 06:02 12.61    RF4 Power Mon. Trip [RF] 0.27 Reset trip, refilled
# 6 10/20 06:19 To 10/20 07:59 1.68    Int Dump: End of Period 0.00

  0.00
# 7 10/22 08:00 To 10/28 07:59 144.00    Int Dump: End of Period 0.00

  0.00
# 8 10/29 08:00 To 10/29 20:19 12.33    Quadrupole PS trip [PS] 1.56 Swapped the P.S., refilled
# 9 10/29 21:53 To 10/30 09:24 11.52    Bldg.450 valve fail[OTH] 1.85 Bypassed degassifier, recovered systems, refilled
# 10 10/30 11:15 To 11/03 07:59 93.74    Int Dump: End of Period 0.00

  0.00
# 11 11/05 08:00 To 11/05 21:35 13.58    S2 Sextupole problem[PS] 2.46 Swapped out two power supplies, refilled ring
# 12 11/06 00:02 To 11/06 07:56 7.89    Rad Mon lost power[OTH] 1.00 Installed temp rad monitor, refilled
# 13 11/06 08:56 To 11/06 16:38 7.69    2ID EPS & PSS trips[SI] 0.87 2ID taken offline, trips reset, refilled ring
# 14 11/06 17:30 To 11/08 15:21 45.85    DCCT MPS fault [DIAG] 0.79 Investigation, refill
# 15 11/08 16:08 To 11/09 19:17 27.14    S21 Vac Valve fault[CTL] 0.38 Investigation, refill
# 16 11/09 19:39 To 11/09 22:14 2.57    S21VacVlv MPS fault[CTL] 3.44 Replaced latch card, validated, refilled
# 17 11/10 01:40 To 11/11 07:59 30.33    Int Dump: End of Period 0.00

  0.00
# 18 11/12 08:00 To 11/13 20:16 36.27    S2 Quadrupole failed[PS] 1.11 Replaced P.S., conditioned & refilled
# 19 11/13 21:23 To 11/18 04:25 103.04    23ID:P2 BPM Flow [MOM] 1.00 Investigation, reset and refilled
# 20 11/18 05:25 To 11/18 07:59 2.57    Int Dump: End of Period 0.00

  0.00
# 21 11/19 08:00 To 11/26 23:59 183.99    Int Dump: End of Period 0.00

  0.00
# 22 11/28 08:00 To 11/30 12:09 52.16    S34 Vac Vlv MPS flt[CTL] 0.81 Investigation, refill
# 23 11/30 12:58 To 12/02 08:00 43.03    Int Dump: End of Period 0.00

  0.00
# 24 12/03 08:00 To 12/09 07:59 144.00    Int Dump: End of Period 0.00

  0.00
# 25 12/10 08:00 To 12/13 08:10 72.16    S33 FE-EPS Flow Flt [SI] 2.29 Repair, replaced S1 sextupole twice
# 26 12/13 10:27 To 12/13 21:53 11.43    S1 Sextupole Trip [PS] 2.86 Investigation, repair
# 27 12/14 00:45 To 12/16 07:59 55.24    Int Dump: End of Period 0.00

  0.00
# 28 12/17 08:00 To 12/18 10:41 26.69    Transformer fault [FMS] 1.15 RF3/5 waveguide switch, P.S. faults

  4.22
# 29 12/18 16:08 To 12/18 21:11 5.05    Booster Hybrid load [RF] 14.68 Leak at hoses, load, & into kicker magnet
# 30 12/19 11:52 To 12/22 07:59 68.12    Starting Supplemental 0.00
Top-Up Mode Statistics
Target Current Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes Total
Current in Range during Scheduled Topup Time 97.89 %
Current in Range during Delivered Beam Time 99.07 %
Injector Availability 99.01 %
Period Beginning 10/01/2008 08:00
Current in Range 97.73 %
Injector Availability 97.69 %
Out of Range at: 10/01/2008 18:04:40 to 10/01/2008 21:20:40 : 196.00 minutes
Injector downtime:10/01/2008 17:59:44 to 10/01/2008 21:19:36 : 199.87 minutes
Period Beginning 10/08/2008 08:00
Current in Range 100.00 %
Injector Availability 100.00 %
Period Beginning 10/15/2008 08:00
Current in Range 98.93 %
Injector Availability 98.79 %
Out of Range at: 10/20/2008 02:40:48 to 10/20/2008 03:07:20 : 26.53 minutes
Injector downtime:10/20/2008 02:35:52 to 10/20/2008 03:07:16 : 31.40 minutes
Out of Range at: 10/20/2008 07:02:00 to 10/20/2008 07:50:16 : 48.27 minutes
Injector downtime:10/20/2008 06:57:04 to 10/20/2008 07:50:12 : 53.13 minutes
Period Beginning 10/22/2008 08:00
Current in Range 99.96 %
Injector Availability 99.91 %
Out of Range at: 10/27/2008 04:43:28 to 10/27/2008 04:47:20 : 3.87 minutes
Injector downtime:10/27/2008 04:35:28 to 10/27/2008 04:43:28 : ~ 8.00 minutes
Period Beginning 11/05/2008 08:00
Current in Range 99.94 %
Injector Availability 99.80 %
Out of Range at: 11/09/2008 14:27:20 to 11/09/2008 14:28:40 : 1.33 minutes
Injector downtime:11/09/2008 14:19:20 to 11/09/2008 14:27:20 : ~ 8.00 minutes
Out of Range at: 11/09/2008 22:10:08 to 11/09/2008 22:14:00 : 3.87 minutes
Injector downtime:11/09/2008 22:02:08 to 11/09/2008 22:10:08 : ~ 8.00 minutes
Period Beginning 11/12/2008 08:00
Current in Range 99.29 %
Injector Availability 99.22 %
Out of Range at: 11/12/2008 21:00:16 to 11/12/2008 21:48:08 : 47.87 minutes
Injector downtime:11/12/2008 20:55:20 to 11/12/2008 21:46:56 : 51.60 minutes
Out of Range at: 11/18/2008 05:25:44 to 11/18/2008 05:38:24 : 12.67 minutes
Injector downtime:11/18/2008 05:20:48 to 11/18/2008 05:35:12 : 14.40 minutes
Period Beginning 11/19/2008 08:00
Current in Range 99.55 %
Injector Availability 99.53 %
Out of Range at: 11/24/2008 10:42:32 to 11/24/2008 11:31:52 : 49.33 minutes
Injector downtime:11/24/2008 10:37:36 to 11/24/2008 11:29:36 : 52.00 minutes
Period Beginning 11/28/2008 08:00
Current in Range 100.00 %
Injector Availability 100.00 %
Period Beginning 12/03/2008 08:00
Current in Range 96.43 %
Injector Availability 96.36 %
Out of Range at: 12/06/2008 08:24:48 to 12/06/2008 11:10:32 : 165.73 minutes
Injector downtime:12/06/2008 08:19:52 to 12/06/2008 11:09:12 : 169.33 minutes
Out of Range at: 12/08/2008 10:42:32 to 12/08/2008 13:04:56 : 142.40 minutes
Injector downtime:12/08/2008 10:37:36 to 12/08/2008 13:02:48 : 145.20 minutes
The information on this page is automatically generated and may contain errors. An official operations statistics page will be posted at the end of each user period.